Customization: | Available |
---|---|
Condition: | New |
Customized: | Customized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Soft Drinks Pretreatment/Syrup Blending/Mixing Tank/Sugar Melting/Dissolving Tank
Type |
QHS 1500 |
QHS - 3000 |
QHS 4000 |
QHS - 5000 |
QHS - 6000 |
Production Capacity (kg/h) |
1000 - 1500 |
2500 - 3000 |
2000 - 4000 |
2500 - 5000 |
4000 - 6000 |
Adjust Proportion of Syrup and Water |
1:3 1:10 |
1:3 1:10 |
1:3 1:10 |
1:3 1:10 |
1:3 1:10 |
Gas Qty |
1.5-2.5 |
2.5 |
2.5 |
2.5 |
2.5 |
Cool Water Entry Temperature () |
0 - 5 |
||||
Working Pressure (MPa) |
0.05 0.15 |
||||
Storage Tank Working Pressure (MPa) |
0.2 0.5 |
||||
Power (KW) |
1.5 |
3.7 |
4.05 |
5.6 |
6.2 |
Dimension (mm) |
900 * 700 *2000 |
1720 * 1140 *2100 |
1860 * 1300 *2100 |
1960 * 1400 *2150 |
2020 * 1500 *2200 |
Weight (kg) |
500 |
1100 |
1300 |
1600 |
1800 |
Tank size | 300L~10,000L | |
CIP Tank type | alkali tank, acid tank, hot water tank, pure water tank, water recycle tank | |
Cleaning recycles | Single circuit, double circuits, three circuits, four circuits | |
Heating method | Coil pipes inside, plate, tubelar | |
Automatic types and charastics | Fully automatic | 1. Flow rate auto control 2. Temperature auto control 3. Auto compensate cip liquid level 4. Auto compensate the liquid concentrate 5. Cleaning liquid auto transfer 6. Auto alram° |
Semi-auto | 1.Temperature auto control 2. Electrical control with manual operate the other matters. |
|
Manual control | 1. Manual operate on the cleaning process |
Washing process:take dairy and beverage industry as an example
1. Wash for 3-5 minutes at room temperature or above 60°C hot water; alkali wash for 10-20 minutes, 1%-2% solution, 60°C-80°C; middle wash for 5-10 minutes, clean water below 60°C; Finally wash for 3-5 minutes, clean water.
2. Wash for 3-5 minutes, hot water at room temperature or above 60°C; alkali wash for 5-10 minutes, 1%-2% solution, 60°C-80°C, middle wash for 5-10 minutes, clean water below 60°C, Sterilize for 10-20 minutes with hot water above 90°C.
More photos for ref
Machine setup and commissioning
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary.
Contact information
Please write to us with below information for getting detailed quotation sheet quickly:
- What is the filling material;
- What is your bottle type and cap type;
- How many bottle types that you have;
- How many bottles per hour you will produce;
Shipping & Cooperation brand